Resumption of operation of the gray EPS plant
We would like to inform you that in the first half of September we resumed operation of the installation and production of gray EPS (InVento) at the plant owned by Synthos Dwory Sp. z o.o. in Oswiecim.
At the same time, we declare that the force majeure that we declared in connection with the event that occurred on June 21, 2024, is over.