Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o.) as an OSD Distribution System Operator performs the tasks related to the distribution of electricity within the Company(where the majority of the company's energy system is located) and in its immediate vicinity. Division and distribution of electricity is carried out at the following voltage levels:

 

  • High voltage: 30 and 6kV,
  • Low voltage: 500 and 400V.

The Synthos Dwory 7 power grid composition consists of: 

  • 110 kV overhead power supply and 110/30 kV transformer and distribution substation,
  • electrical switchgear with a rated voltage of 30 kV,
  • transformer distribution stations 30/6 kV,
  • transformer distribution stations 30/6 / nN,
  • electrical switchgear with a rated voltage of 6 kV,
  • transformer distribution stations 6 kV / nN,
  • power distribution nN - including connectors and measuring and clearing systems,
  • a power cable network connecting the individual power circuits at all voltage levels.


Synthos Dwory 7 Sp. z o.o., Sp. j. company (formerly Synthos Dwory 7 Sp. z o.o., S.K.A.), apart from its own power sources also has a 110 kV power line belonging to Enion S.A. Bielsko Biała Branch, through which the exchange of electricity (depending on needs) is carried out between the two distribution companies.
Within the scope of its activity, the Company carries out actions associated with the connection of new electricity consumers to its distribution network. It also performs other services related to handling electrical energy recipients connected to their network.

Connections

The person (company) applying for connection of a facility to the power grid, should issue a motion to determine the connection conditions for the appropriate connection group. Such a motion should also be issued in case of replacement of the connection at the request of the interested party, or if an increase of the connection power occurs (the maximum power which will be charged).

The currently regulations divide entities which are being attached to the network into the following connection groups:

  1. Group II entities connected directly to the distribution network with voltage of 110 kV, or having production units cooperating with the network, or requiring non-standard energy supply,
  2. Group III entities connected directly to the medium-voltage distribution network (1 kV <Un <110 kV),
  3. Group IV entities connected directly to a low-voltage network (Un <1 kV) with a connection power greater than 40 kW or an pre-set meter protection greater than 63 A,
  4. Group V entities connected directly to a low voltage network (Un <1 kV) with a connection power of no more than 40 kW and a pre-set meter protection of not more than 63 A,
  5. Group VI entities connected to the network by a temporary connection, which will be replaced by the default connection or are connected for a limited period of not more than 1 year.
  • The person applying for the connection should fill out the application form for the appropriate connection group.
  • The application should specify, among others, the following parameters: the value of the connection power - the maximum that will be used and the expected connection date

Each application should be accompanied by the following documents:

  • the applicant's legal title to the facility in which the connected installations will be used (e.g act of ownership, lease agreement or lease),
  • plan of the building on an architectural map with building altitudes, or a sketch indicating the location of the object relative to existing buildings and networks,
  • an extract from the commercial register or a certificate of entry into the Business Activity Register (for objects intended for business activity).

The connection conditions define (among others) the following points:

  • the scope of the work to be done to attach the object to the network,
  • location and type of measuring system,
  • size, type and location of the main security,
  • proposed location for the exploitation limit.

With the terms, the applicant receives a draft of the connection agreement and information about the connection fee. Connection conditions are valid for 2 years. If a facility has not been connected to the network during this period, a new application for connection conditions should be submitted.
Detailed guidelines for connecting the Customer to the supplier's network can be found in the regulation: "W sprawie szczegółowych warunków funkcjonowania systemu elektroenergetycznego (Dz. U.07.93.623)" (regulation title translation - “On the details of the functioning of the power system”)

For the application to be processed, a complete set of documents is required.

Forms

Vendor Change Procedure

[Translate to English:]

Power supply Vendor Change Procedure for customers connected to the Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) network.

 

According to the Act of 10 April 1997 - Prawo Energetyczne (Dz. U. z 2006 r. Nr 89, poz. 625 z późn. zm.) (act title translation : Energy Law), each electric power user,  including the ones using electricity for household purposes, has the right to purchase energy from a dealer of his choice.
This means there is a possibility to purchase electricity from a selected power supply Vendor.

The Vendor is an energy company which has the legal right to produce or trade electricity on the territory of Poland. The right to produce and / or trade electricity comes from the concession granted by the President of the Energy Regulatory Office. List of entities holding concessions for the production and / or trading of electricity is available on the website of the Energy Regulatory Office - license search:

 

http://maszwybor.ure.gov.pl/portal/or/

Vendor changes should be made on the WZZS form (available on the Forms tab).

Vendor change procedure

Duration:
 

The first change of Vendor

Next Vendor changes

 

Measuring system with data transmission as well as without data transmission

 

Measuring system no data transmission

Measuring system with data transmission

21 days

21 daysi

14 days

What do you need to do to change the Vendor:

1.

The first step in the Vendor’s change procedure is to conclude a contract for the sale of electricity with a new (selected) Vendor.

 

The primary condition for the Vendor to sell electricity to the receivers connected to the Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) network, is to have a valid agreement for the provision of electricity distribution services signed with Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) (OSD).

2.

The next step is to terminate the contract existing with the current Vendor, taking into account the terms and dates of its termination, as defined in the current complex contract (this is the electricity sale contract, together with the distribution service) or the electricity sale contract.

3.

In the next step, the user, along with his new, selected Vendor together fill out and sign the form: “Notification of Sale Agreement”. The signed form can be submitted personally in Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) or sent by post. Submission of this document begins the procedure for changing the Vendor.

4.

Within 7 working days from the date of receipt of the application ("Notification of Sale Agreement"), Synthos Dwory 7 Sp. z o.o., Sp.j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) verifies the submitted document.

 

§  In the case of errors, the application is verified negatively, which the user and the Vendor are informed of. The Vendor change process is over.

§  If the data on the submitted document is correct, the request is validated and both the recipient and the new Vendor are informed about this.

5.

In case there is a need to adjust the measurement and settlement systems to the requirements specified in the Instruction for Traffic and Exploitation of the Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) Distributive Network (IRiESD Balancing), Recipients qualified for III and VI Medium voltage power supply groups are required to adapt these systems at their own cost.

6.

If the Recipient does not have a signed agreement for electricity distribution services with Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.), the next step in the Vendor change procedure, is signing such an agreement. The User receives two copies of the distribution service agreement. The Recipient (or his authorized Vendor) should sign and deliver the signed contract  to Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) at least 10 days before the date of its entry into force.

7.

After fulfilling the technical and legal requirements, Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.) assigns the measurement point and the Customer to a new Vendor.

8.

The last element of the change procedure is the reading of the measurement and billing system. Information from the read is provided to both the current and the new seller.

Tariffs and Concessions

Concessions

Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.), holds a concession for the distribution of electricity granted by the President of the Energy Regulatory Office no. PEE/239/3273/W/2/2001/MS from 20.09.2001r. amended by the Decision of the President of the Energy Regulatory Office No. PEE / 239A / 3273 / W / 2/2004 / MS of 4.08.2004, as amended by Decision of the President of the Energy Regulatory Office No. DEE / 239B / 3273 / W / OKR / 2006 / JP of 14.07.2006, as amended by the President of the Energy Regulatory Authority DEE / 239-ZTO / 239C / 3273 / W / 2/2009 / UA dated 29.12.20009, amended by Decision of the President of the Energy Regulatory Office No. DEE / 3273 / W / 2/20010 / MUA dated 30.06.2010r. for the period up to 31.12.2030

 

Electricity tariff
Tariffs related to the area of electricity distribution can be found in the Electricity Tariff No. 5 / SD approved by the President of the Energy Regulatory Office dated March 1, 2016, No. OKR-4211-38 (11) / 2015/2016/3273 / XIA / JM.


The current amendments to the Electricity Tariff No. 5 / SD are presented in the text of the President's Decision URE no. OKR-4211-48(3)/2016/3273/XIB/EŚ from 13 December 2016 roku and provide updates on the tariffs for electricity no 5/SD.

News and Announcments

2017-05-26

 

We would like to inform you that Synthos Dwory 7 Sp. z o.o., Sp. j. (formerly Synthos Dwory 7 Sp. z o.o. S.K.A.), concluded on May 25, 2017, the consultation process for the IRiESDn Project (Instruction for Distributive Network Traffic and Exploitation). 

As of May 26, 2017, Synthos Dwory 7 Sp. z o.o., Sp. j. has developed and approved to use of the updated Instruction for Distributive Network Traffic and Exploitation (IRiESDn) in accordance with Update Sheet 1/2017.
By publishing on its website the IRiESDn Update Card No. 1/2017, Synthos Dwory 7 Sp. z o.o., Sp. j. hereby informs about public access possibility for the IRiESDn content.

 

Download files:

2017-05-10

 

Please be informed that Synthos Dwory 7 Sp. z o.o., Sp. j. has developed a draft of the Update Sheet No. 1/2017 of the Instruction for Distributive Network Traffic and Exploitation (IriESDn).
By publishing on its website the draft of IRiESDn Update Card No. 1/2017, Synthos Dwory 7 Sp. z o.o., Sp. j.  hereby informs the possibility of public access to its content and at the same time submits the Update Card for consultation in accordance with Art. 9g sec. 2 of the Energy Law Act.

Due to this, Synthos Dwory 7 Sp. z o.o., Sp. j., requests the submission of any comments on the IRiESDn update.

Comments can be submitted by May 25, 2017 (deadline for submitting comments) in the following way: 

Via email: dystrybucja@synthosgroup.com
Or using a fax machine, dialing : 33 847 27 01

Please submit comments on the Application Form separately for each of the individual parts of the IRiESDn update project, using one of the methods mentioned above.

Download files:

2016-12-21 

 

By decision of the President of URE (No. OKR-4211-48 (3) / 2016/3273 / XIB / EŚ dated 13 December 2016), the amendment to the Electricity Tariff No. 5 / SD has been approved for Synthos Dwory 7 Sp. z o.o., Sp. j.. The company introduces changes to the Tariff for electricity no. 5/SD to be implemented as of January 1, 2017. The content of the changes made to the Tariff is available on the Tariffs and concessions tab.

2016-03-03

 

By decision of the President of URE no. OKR-4211-38(11)/2015/2016/3273/XIA/JM from 1st of March 2016, the Electricity Tariff No. 5 / SD has been approved for Synthos Dwory 7 Sp. z o.o., Sp. j. The Tariff applies as of April 1, 2016. The content of the approved Tariff No. 5 / SD can be found on the Tariffs and Concessions tab.

2016-01-07

 

By decision of the President of URE no. OKR-4211-138(5)/2015/3273/XI/MGi from December 17, 2015 the Electricity Tariff No. 5 / SD has been partially approved for Synthos Dwory 7 Sp. z o.o., Sp. j.. The company applies the partially approved Tariff no. 5/SD for use: 

  • as of January 1, 2016 in regards to the change of rates in the transitional fee;
  • as of July 1, 2016 in regards to the introduction of a new rate of Renewal Energy fee.

 

The content of the partially approved Tariff No. 5/SD can be found on the Tariffs and Concessions tab.For other settlements Tariff No. 4/SD is in use. 

2015-03-16

 

By decision of the President of Energy Regulatory Office (ERO) no.OKR-4211-42(9)/2014/2015/3273/XA/MKo2, dated March 12, 2015 the change to Electricity Tariff No. 4/SD has been approved for Synthos Dwory 7 Sp. z o.o., Sp. j.. The company applies the changes in Electricity Tariff No. 4/SD as of April 1, 2015. The content of changes made to Tariff No. 4/SD can be found on the Tariffs and Concessions tab.

2014-11-14

 

By decision of the President of Energy Regulatory Office no. OKR-4211-13(11)/2014/3273/X/TK from November 13, 2014, the Electricity Tariff No. 4/SD has been approved  for Synthos Dwory 7 Sp. z o.o., Sp. j.. The company applies Electricity Tariff No. 4/SD as of December 1, 2014. The content of Tariff No. 4/SD can be found on the Tariffs and Concessions tab.

2014-03-17

 

Please be informed that Synthos Dwory 7 Sp. z o.o., Sp. j. has developed and approved the Instruction for Distributive Network Traffic and Exploitation (IRiESDn).

By publishing IRiESDn on its website, Synthos Dwory 7 Sp. z o.o., Sp. j., makes its content public.

2014-02-12

 

Please be informed that Synthos Dwory 7 Sp. z o.o., Sp. j. has developed a draft of the Instruction for Distributive Network Traffic and Exploitation (IRiESDn).

By placing the IRiESDn project on their website, Synthos Dwory 7 Sp. z o.o., Sp. j. herby makes this document public, and submits the instruction for consultation - according to Art. 9g sec. 2 of the Energy Law Act.
Accordingly, Synthos Dwory 7 Sp. z o.o., Sp. j. requests to submit comments regarding the IRiESDn project. 

Comments can be submitted by Match 6, 2014 (deadline for submitting comments) in the following way: 

Please submit comments on the Application Form separately for each of the individual parts of the IRiESDn project, using one of the methods mentioned above.

2014-01-21

 

 

By decision of the President of Energy Regulatory Office no. OKR-4211-42(15)/2013/2014/3273/IXA/EŚ from January 17, 2014 an amendment to Electricity Tariff no.3/SD has been approved for Synthos Dwory 7 Sp. z o.o., Sp. j.. The company enforces Tariff no. 3/SD: 

  • As of January 1, 2014 - in regards to the change of rates in the transitional fee;
  • As of February 2, 2014 -  in regards to the change of rates in the quality fee. 

The content of Tariff No. 3/SD can be found on the Tariffs and Concessions tab.

2013-12-16

We would like to inform you, that in the Energy Regulatory Office President’s NOTIFICATION no. 31/2013 from October 21, 2013 regarding rates for transitional tariff for the year 2014, new rates for transitional tariff have been published. They will take effect from January 1, 2014 till December 31, 2014. The NOTIFICATION has been published according to 
Art. 12 paragraph 2 of the Act from June 29, 2007 on the rules for covering costs which arose as a result of early termination of long-term power and electricity sales agreements (Dz.U.2007.130.905).
With this announcement Synthos Dwory 7 Sp. z o.o., Sp. j. introduces new rates for the transitional fee. This has been announced in the previously mentioned NOTIFICATION - to be used since January 1, 2014. 

 

2013-06-14

 

By decision of the President of ERO no. DTA-4211-10(18)/2013/3273/IX/MGi from June 30, 2013, Electric Tariff 3/SD has approved for Synthos Dwory 7 Sp. z o.o., S. K. A.. The company enforces Tarif 3/SD as of July 1, 2013. 
The content of Tariff No. 3/SD can be found on the Tariffs and Concessions tab.

2013-01-15 

By decision of the President of ERO no. DTA-4211-100(4)/2012/2013/3273/VIII/JS from January 10th, 2013 an amendment to Electricity Tariff no.2/SD has been approved for Synthos Dwory 7 Sp. z o.o., S. K. A.. The company enforces the amendments to Tariff no.2/SD as of February 2, 2013. 
The content of amendments to Tariff No. 2/SD can be found on the Tariffs and Concessions tab.

 

2012-02-06 

 

By decision of the President of ERO no. DTA-4211-68(4)/2012/3273/VIII/JS from November 28, 2012 an amendment to Electricity Tariff no. 2/SD has been approved for Synthos Dwory 7 Sp. z o.o., S. K. A..The company enforces the amendments to Tariff no.2/SD as of January 1, 2013.
The content of amendments to Tariff No. 2/SD can be found on the Tariffs and Concessions tab.

 

2012-02-15

 

By decision of the President of ERO no. DTA-4211-46(15)/2011/2012/3273/VIII/JS from February 14, 2012 Electricity Tariff no. 2/SD has been approved for Synthos Dwory 7 Sp. z o.o., S. K. A..
The company enforces Tariff no.2/SD as of March 1, 2012. The content of Tariff No. 2/SD can be found on the Tariffs and Concessions tab.

2011-04-29

 

We would like to inform you that according to the announcement from April 12, 2011, as of April 27, 2011, Synthos Dwory 7 Sp. z o.o., S. K. A., acting as the Distribution System Operator finished the consultation phase for the Instruction for Distributive Network Traffic and Exploitation update project. 

After the end of the consultation phase, on April 29, 2011 Synthos Dwory 7 Sp. z o.o., S. K. A. has sent to the President of Energy Regulatory Office (ERO) the developed amendment project of IRiESD for approval, along with a Report on the course of consultation.  

Downloads, version of IRiESD sent for approval to the President of ERO:

2011-04-12

 

We would like to inform you that Synthos Dwory 7 Sp. z o.o., S. K. A. has developed a project of the Instruction for Distributive Network Traffic and Exploitation (Polish acronym - IRiESDn)
By publishing on their webpage the project of IRiESDn Synthos Dwory 7 Sp. z o.o., S. K. A. makes the content of IRiESDn public. At the same time the company submits the instruction for consultation, as per Art. 9g, paragraph 2 Law- Energy Law. 

Accordingly, Synthos Dwory 7 Sp. z o.o., S. K. A. requests to submit comments regarding the IRiESDn project. 

Comments can be submitted by April 27, 2011 (deadline for submitting comments) in the following way: 

Please submit comments on the Application Form separately for each of the individual parts of the IRiESDn project, using one of the methods mentioned above.

Downloads:

OSD Reporting

 

Announcement regarding the appointment of obliged vendor by the President of Energy Regulatory Office

The President of ERO appointed an obliged vendor in the Synthos Dwory 7 Sp. z o.o., Sp. j. area of activity. This has been done in accordance to Art. 40, paragraph 3 of Act from February 20, 2015 on renewable energy sources (Dz.U. z 2015 r. poz.478, with later amendments). The obliged vendor is Dwory 7 Sp. z o.o., Sp. j., based in Oświęcim, Chemików 1, 32-600 Oświęcim.  

Report for 2016 on interruptions in electricity supply

As per the Ordinance of the Minister of Economy from August 21, 2008, changing the previous ordinance regarding detailed conditions for the functioning of the power system, the Distribution System Operator shall make public on his website the following indicators concerning the duration of electricity supply interruptions:

  • SAIDI (System Average Interruption Duration Index) - an indicator for the average system time for long and very long interruptions, expressed in minutes per recipient per year. It is the sum of all customer interruption durations, divided by the total number of customers served.
  • SAIFI (System Average Interruption Frequency Index) -  an indicator for the average number of long and very long interruptions that a customer would experience. It constitutes the total number of customer interruptions in a year, divided by the total number of customers served.
  • MAIFI (Momentary Average Interruption Frequency Index) - an indicator the average number of momentary interruptions that a customer would experience in a year, divided by the total number of customers served.

The regulation specifies the following types of power supply interruptions:

  1. Planned- resulting from scheduled maintenance work on the power grid. The duration of this interruption is counted from the time the switch is opened until the resumption of electricity supply.
  2. Unplanned - resulting from power grid failure. The duration of this interruption is calculated from the moment the energy company receives notification about this interruption until the resumption of electricity supply.


Interruptions in the supply of electricity, depending on their duration, are divided into the following categories:

  1.   transient (micro interruptions), lasting less than 1 second,
  2.   short, lasting not less than 1 second and not longer than 3 minutes,
  3.   long, lasting not less than 3 minutes and no longer than 12 hours,
  4.   very long, lasting not less than 12 hours and not longer than 24 hours,
  5.   catastrophic, lasting more than 24 hours.

Indicators for the duration of the electricity supply interruptions designated in accordance with the Regulation for the Synthos Dwory 7 Sp. z o.o., Sp. j. area of operation.

 

FOR PLANNED INTERRUPTIONS

FOR UNPLANNED INTERRUPTIONS

  without catastrophicwith catastrophic

 SAIDI

Indicator for long breaks average system duration (in minutes)

 

Recipients exposed - unplanned 14

planned 6

Recipients served - 170

 

 7,941 min.

 
6,529 min.


0,00 min.

 SAIFI

Indicator for long brakes average system frequency

 

Recipients exposed - unplanned 14

planned 6

 

Recipients served - 170


 0,035


 0,082


0,00

 MAIFI

Indicator for average frequency of short brakes

 

Recipients exposed - 0

Recipients served - 170

 0,00

 Published: Oświęcim, March 2017

 

 


List of entities applying for source connection and power available for their connection

Information about entities applying for source connection to Synthos Dwory 7 Sp. z o.o., Sp. j. electrical grid with a rated voltage higher than 1 kV, and the total value of the available connection power for the sources. This information is presented in accordance to Art. 7, paragraph 81 point 1 of Act from April 10, 1997, Electrical Law (Dz. U. z 2006 r. Nr 89, poz. 625 with later changes).